|
Our factory delivers the building kit materials directly to your site. The kit is usually sent by articulated lorry and you will need space for this or arrange for a nearby location where it can be delivered to. A fork lift is usually required to offload the building and this is often attached to the arctic making the delivery, but this cannot be guaranteed; in this case you will need to arrange offload.
The materials need to be checked for damaged or missing items within 48 hours. If you leave it any longer the parts may not be replaced free of charge.
|
|
|
|
 |
Atlantic Steel Buildings Agricultural buildings and Industrial units |
|
 |
|